Canacol Energy has announced that Clarinete-1, the first well drilled in its recently acquired VIM 5 exploration and production contract, has tested at a final gross rate of 20.6 MMcfd (3,606 boed) of dry gas with no water in the first of two planned production tests over two separate reservoir intervals. ...»
No comments:
Post a Comment