Baker Hughes’ first field trial of its LEAP adaptive production system, installed on Dec. 12 at a depth of 5,200 ft in the Mississippi Lime play in Woods County, Oklahoma, for SandRidge Energy, is delivering 300% greater oil production and 200% higher natural gas production compared to the previous artificial lift solution.
...»
No comments:
Post a Comment