AWE Limited has been advised by Santos, as Operator, that a successful Drill Stem Test (DST) has been conducted on the G Sand reservoir at the AAL-4XST1 appraisal well, offshore Indonesia, achieving an averaged stabilized flow rate of 828 bopd on a 64/64-in. choke over a 9-hr period.
...»
No comments:
Post a Comment