Otto Energy Limited has advised that the Ensco 68 drilling rig has been repositioned over the SM 71 F1 well and operations to complete the F1 as a producing well in the D5 Sand have begun. This marks the end of drilling operations which began in early December 2017.
...»
No comments:
Post a Comment