Thursday, 29 March 2018

Production starts up at Timimoun gas field in Algeria

Total announces first gas from the Timimoun field in southwestern Algeria. The production complex with a capacity of around 5 MMcmgd at plateau (around 30,000 boed), is jointly operated by Sonatrach (51%), Total (37.75%) and Cepsa (11.25%). ...»

No comments:

Post a Comment