Blockline And Associate Ltd Blog


Blockline and Associate Ltd are sellers of light crude oil and other petroleum products. We also sell and lease out marine equipments, construction machinery and other equipments.

We sell Crude Oil, D2, AGO and other Petroleum product such as:

Crude Oil TankerNigeria Bonny Light Crude Oil (BLCO, FLCO and ALCO, etc): We sell mostly on FOB, CIF, TTO and TTT/STS Basis.

Automotive Gas Oil (AGO) and D2: We sell mostly on CIF and TTT/STS.

Bitumen: We sell on CIF and FOB Basis

Marine Equipments/Machines:

We sell and lease all kinds of marine equipments/machines.

Well sell and lease all kinds of vessel e.g. oil tanker, cargo vessel, crew vessel etc.

Marine DredgesWe sell and lease tug-boats of all kinds.

We sell and lease barges and sea going barges.

We sell and lease dredgers, swamp-buggy, cranes of all kinds, tug-boats of all kinds bulldozers, etc.

Crushing machine of all kinds and screening plant: We sell on CIF and FOB Basis.

Steel and Metal:

We sell steel pipes and tubes of all kinds

We sell metals of all kinds.

GENERAL CONTRACTORS:

We are also into real estate, transportation, communications and more.


Monday 14 July 2014

Petronas launches hull of its first floating LNG facility

Petronas has launched the hull of its first floating LNG (PFLNG 1) facility at the Daewoo Shipbuilding & Marine Engineering (DSME) shipyard in Okpo, South Korea. The facility, scheduled to be completed in Quarter 4 of 2015, will be the world’s first floating LNG facility in operation.
 
The launch, which took place on April 5, 2014, saw the 365 m long hull equivalent to three NFL football fields in length float out at a dock and launched to anchor at a quayside of DSME shipyard where the facility is being constructed.This phase marks another milestone in the development of the facility and signifies the near completion of hull construction works, less than 10 months since the cutting of the first steel in June 2013.
 
Petronas’ VP Datuk Abdullah Karim said, “It is an impressive achievement that we launch the hull within a short time frame following the keel laying process that began on 6 January 2014.In addition, the project has also achieved more than 5.5 million total safe man-hours since the project commenced in March 2012, with no occurrence of loss time incidents at the project site.”
 
“Petronas is currently working closely with its strategic partners, Technip and Daewoo Shipbuilding & Marine Engineering to ensure that the project is delivered safely, in accordance to project specification and quality, within cost and on schedule,” he added.
 
The PFLNG1 vessel, also known as PFLNG SATU, will be moored in Malaysia’s Kanowit gas field, 180 km offshore Sarawak and will produce 1.2 mtpy of LNG.It will play a significant role in Petronas’ efforts to unlock the gas reserves in Malaysia' s remote and stranded fields currently deemed uneconomical to develop and evacuate and will help meet the growing demand for gas.
 
The floating LNG facility is expected to change the landscape of the LNG business where the liquefaction, production, storage and offloading processes of LNG previously only possible at onshore plants will now be able to be carried out hundreds of km away from land and closer to the offshore gas fields.The facility can also be the solution for early monetisation and more agile LNG production.


Providing useful resources, articles and writings on crude oil, other petroleum products, energy and gas. By Blockline and Associate Ltd Nigeria Ltd, online.

No comments :

Post a Comment

Contact Blockline Associate Ltd
Contact Blockline Associate Ltd At Sea

World Energy Production